Lebanon, Indiana | Drinking Water Utility Company
The vicinity drinking water in Lebanon Utilities could be tainted by various impurities including but not limited to Tetrahydrofuran, N-Nitrosodi-N-butylamine and 1,2,4-Trimethylbenzene, while experiencing rising degradation of water hardness. Lebanon Utilities supplies your neighborhood with drinking water which originates its water from Groundwater.
What's in your drinking water?
Get the Lebanon Utilities Official Water Score Report for Free (Limited Time).
US Public Records
Lebanon Utilities Details
Area served:
Lebanon, Indiana
Population served:
16854
Water source:
Groundwater
Phone:
765-482-5100
Address:
401 S. Meridian Street, Lebanon, IN 46052
3date
Contaminants Detected In Lebanon, Indiana
Total trihalomethanes (TTHMs); Chromium (hexavalent); Arsenic; Barium; Fluoride; Selenium; Antimony; Chloroform; Bromoform; Bromodichloromethane Chlor… more
Get the Lebanon Utilities Official Water Score Report for Free (Limited Time).
GET THE FACTS & PROTECT YOUR FAMILY!
US Public Records
Lebanon Utilities
Annual Drinking Water Report
List of Drinking Water Contaminants Tested by Lebanon Utilities
But Not Detected:
1,1,1,2-Tetrachloroethane; 1,1,1-Trichloroethane; 1,1,2,2-Tetrachloroethane; 1,1,2-Trichloroethane; 1,1-Dichloroethane; 1,1-Dichloroethylene; 1,1-Dichloropropene; 1,2,3-Trichloropropane; 1,2,4-Trichlorobenzene; 1,2-Dibromo-3-chloropropane (DBCP); 1,2-Dichloroethane; 1,2-Dichloropropane; 1,3-Butadiene; 1,3-Dichloropropane; 1,3-Dichloropropene; 1,4-Dioxane; 2,2-Dichloropropane; 2,4,5-TP (Silvex); 2,4-D; Alachlor (Lasso); Atrazine; Benzene; Benzo[a]pyrene; Beryllium; Bromobenzene; Bromochloromethane; Bromomethane; Cadmium; Carbofuran; Carbon tetrachloride; Chlordane; Chlorodifluoromethane; Chloroethane; Chloromethane; Chromium (hexavalent); cis-1,2-Dichloroethylene; Cobalt; Cyanide; Dalapon; Di(2-ethylhexyl) adipate; Di(2-ethylhexyl) phthalate; Dibromochloromethane; Dibromomethane; Dichloromethane (methylene chloride); Dinoseb; Diquat; Endothall; Endrin; Ethylbenzene; Ethylene dibromide; Glyphosate; Heptachlor; Heptachlor epoxide; Hexachlorobenzene (HCB); Hexachlorocyclopentadiene; Lindane; m-Dichlorobenzene; Mercury (inorganic); Methoxychlor; Monochlorobenzene (chlorobenzene); MTBE; o-Chlorotoluene; o-Dichlorobenzene; Oxamyl (Vydate); p-Chlorotoluene; p-Dichlorobenzene; Pentachlorophenol; Perfluorobutane sulfonate (PFBS); Perfluoroheptanoic acid (PFHPA); Perfluorohexane sulfonate (PFHXS); Perfluorononanoic acid (PFNA); Perfluorooctane sulfonate (PFOS); Perfluorooctanoic acid (PFOA); Picloram; Simazine; Styrene; Tetrachloroethylene (perchloroethylene); Thallium; Toluene; Toxaphene; trans-1,2-Dichloroethylene; Trichloroethylene; Vanadium; Vinyl chloride; Xylenes (total)
What's in your drinking water?
Find out which contaminants are found above Legal and Health Guidelines.
GET THE FACTS & PROTECT YOUR FAMILY!
US Public Records
Lebanon Utilities
About Us
For more Indiana resources & information
Indianapolis Avenue ~ Phase II Most of the City’s infrastructure is definitely reaching the end of its useful lifestyle and needs to be substituted or rehabilitated to avoid costly failures. This kind of project includes the replacement of 6-inch and 8-inch water key with approximately a couple of, 850 feet of 16-inch main within the Indiana Avenue highway project designed by Retainer, Fairman & Seufert. This portion of the project stretches by Hendricks Drive to Spencer Avenue within the southeast side in the City. Multiple easements are still being attained along Indianapolis Opportunity as part of the road job. The easements are not purchased through the Normal water Department. It is predicted that these easements will probably be secured early inside the 4th Quarter. Job Schedule x Last design - Credited July 31, 2016 x Bid -- October 2016 times Construction - The fall of 2016 to Drive 2017 (5 months) Project Costs back button Design and Wager - $55, 1000 x Estimated structure cost - $1, 100, 000 back button Construction inspection ~ $95, 000 installment payments on your Lafayette Avenue This kind of project consists of putting in approximately 3, two hundred fifity feet of new 12-inch water main along Lafayette Avenue among Chicago Street and Riley Road. The project was designed by simply Crawford, Murphy, and Tilly (CMT) and is also hoped to be made by June 2016. A majority of the job is complete. Yet , there is a possibility the fact that work under the train may be delayed simply because the Water Department runs reviews with CSX Railway. Project Plan x Expected to end up being finished with Construction by simply June 2016. Job Costs x Structure, Construction Administration, and Inspection Total Expense - $600, 330. 43 x Normal water Department payment thus far - $269, 833. 84 x Left over Costs - $320, 496. 59 three or more. Generator and Switchgear This project can replace the existing went out with emergency generator on the WTP as well as the life power controls which provide power to the plant and wells in the event of a great REMC outage. Most 4, 160V products will now be located outdoors away from herb personel. The avenue and wires to get the standby electricity and controls can also be replaced. New products will be industry common equipment with easily available parts and services from multiple suppliers. Project Schedule times Design - At present underway, due May possibly 20, 2016 back button Bid - Summer 2016 x Structure - July 2016 to February 2017 Project Cost times Design - Total $29, 000; Wessler Engineering has invoiced $9, 000 found in March and Apr for services supplied in February and March. x Wager - $5, 1000 x Construction Calculate - $395, 1000 x Construction Government - $13, 1000; Support from Wessler during construction some. Water Controls The purpose of this project is usually to update the existing Laurel Control system on the WTP. The existing control system is 28 years of age and nearing the final of its valuable life. An up to date system is crucial to continuous to provide safe drinking water to get the City. Modern handles can also help with better operation of the flower. The Water Department strategies to contract with either BL Anderson or Peerless to achieve this work and is at present in discussion with. Updated costs will probably be provided soon. Job Schedule x Executive - July ~ August 2016 times Installation - Ones 2016 to January 2016 Project Expense x Engineering -- $30, 000 times Installation - $205, 000 5. Good Improvement and Treatment This is a position annual program to get cleaning and preserving the wells. You will discover 10 active bore holes which are on a 5-7 year rotating pattern, resulting in about a couple of wells per year appearing maintained. Regular repair of equipment is crucial to get maintaining the procedure of the system and providing reliable normal water service to Lebanon’s consumers. The Water Department works together Peerless to perform a great overboard test to consider the specific yield of each and every pump to determine in case the pump needs to be taken. If so , that they pull the pump and inspect and perform maintenance into it along with videoing the well. Plan Well maintenance commonly occurs in the Show up of every year. Twelve-monthly Budget $45, 1000 per year, increasing to $50, 000 annually in 2019. main. Enterprise Boulevard Expansion The City is in the organizing stage of a large expansion on the south aspect of I-65. Organization Boulevard will be expanded from SR 39 to County Highway 100 East with expected retail, pastime, and residential expansion around it. The utilities planning remains underway, but the job is moving quickly forward with objectives to start development over the following few years. Currently, the particular water distribution program and a drinking water tower are appearing planned for. The advantages of expansion of the normal water treatment plants to allow for the development still needs to be assessed. Schedule It is predicted that development will start within the next few years. When it comes to this report, the assumption is that design and construction of normal water infrastructure will begin in June 2017 and continue beyond the bounds of this report. Costs As the opportunity of the work is definitely not defined, a great assumed project expense of $250, 000 monthly is used as a placeholder. Schedule and costs will be updated often and possibly significantly mainly because it progresses and jobs are more clearly defined..
For more information on your drinking water, visit the U.S. Environmental Protection Agency:
Lebanon Utilities Drinking Water Company and EPALebanon Utilities Drinking Water Report Info
Lebanon Utilities is a municipally-claimed group of utilities giving electric, sewer, and water administrations to the City of Lebanon and the Town of Ulen. What's more, the organization serves the Town of Elmwood with sewer and water and oversees and works stormwater and broadcast communications offices for the City of Lebanon. The Lebanon Utilities Service Board is accused of the activity of the city's electric, water, and sewage treatment offices with everyday operational obligations appointed to the senior supervisor. The organization is headquartered in the Lebanon Municipal Building situated at 401 South Meridian Street and has offices for electric tasks on 1300 West Main Street and for sewer on 802 Lafayette Avenue. Lebanon Utilities' Mission Statement The crucial Lebanon Utilities is to furnish our locale with dependable, practical and excellent administrations in a neighborly and polite way. Our Vision Statement: Lebanon Utilities will be perceived all through the district as an utility that has accomplished a degree of greatness in client assistance particular from friends both enormous and little. It will be known as an utility that is in tenacious quest for making the WOW factor among its clients to whom it gives utility items and administrations through an invigorated work power. Its representatives will appreciate an air which highlights the positive, advances the free progression of imaginative client responsive thoughts, and is instilled with the qualities that make a soul of elevate for such come in contact. Lebanon Utilities will give a key administration segment in progressing the network it serves into the third thousand years and past. The Company Values incorporate genuineness, reliability, administration greatness, profitability, representative minding, free progression of thoughts and cooperation. It is around these basic beliefs that Lebanon Utilities fabricates its future..
Drinking Water Utility Company FAQ
For more information on your drinking water, visit the U.S. CDC:
Lebanon Utilities Drinking Water Company and CDC.. ...
Lebanon Utilities provides drinking water services to the public of Lebanon and Lebanon, Indiana.
Limited Time: Free Official Water Safety Report for Lebanon Utilities!
GET THE FACTS & PROTECT YOUR FAMILY!
US Public Records
Drinking Water Companies Near Lebanon, Indiana
Indiana American Water - Noblesville Water Company
Bargersville Water Department Water Company
Brownsburg Water Works Water Company
Greencastle Department of Water Water Company
Greenfield Water Utility Water Company
Indiana American Water - Johnson County Water Company
Indiana American Water - Kokomo Water Company
Indiana American Water - Newburgh Water Company
Indiana American Water - Northwest Water Company
Indiana American Water - Seymour Water Company
Commonly Searched Terms:
Why drinking lots of water is good for you, drinking water tap, advantages of drinking plenty of water, drinking enough water, chlorine in drinking water