Redmond Water Department Water Company 💧 3date ALERT Drinking Water

Redmond, Oregon | Drinking Water Utility Company

The vicinity drinking water of Redmond Water Department could possibly be infected with a number of contaminants such as Polychlorinated biphenyls (PCBs), Mercury (inorganic), Chromium and Toluene, and may suffer abnormally high levels of water hardness. Redmond Water Department supplies the area with drinking water that sources its water supply from Groundwater.

What's in your drinking water?

Free Official Water Safety Report for Redmond Water Department!

US Public Records

Redmond Water Department Details

drinking water system for home

Area served:

Redmond, Oregon

is drinking a lot of water good

Population served:

28052

how drinking water helps you

Water source:

Groundwater

benefits of drinking 8 glasses of water daily

Phone:

541-9237710

drinking water company near me

Address:

411 Sw 9th St., Redmond, OR 97756

Oregon Dinking Water Utility

3date

Contaminants Detected In Redmond, Oregon

Chromium (hexavalent); Total trihalomethanes (TTHMs); Chromium (hexavalent); Fluoride; Nitrate and nitrite Molybdenum; Nitrate; Strontium; Vanadium… more

Redmond Dinking Water Utility

Free Official Water Safety Report for Redmond Water Department!

GET THE FACTS & PROTECT YOUR FAMILY!

US Public Records

Redmond Water Department

Annual Drinking Water Report

List of Drinking Water Contaminants Tested by Redmond Water Department

But Not Detected:
1,1,1-Trichloroethane; 1,1,2-Trichloroethane; 1,1-Dichloroethane; 1,1-Dichloroethylene; 1,2,3-Trichloropropane; 1,2,4-Trichlorobenzene; 1,2-Dibromo-3-chloropropane (DBCP); 1,2-Dichloroethane; 1,2-Dichloropropane; 1,3-Butadiene; 1,4-Dioxane; 2,4,5-TP (Silvex); 2,4-D; Alachlor (Lasso); Antimony; Arsenic; Atrazine; Barium; Benzene; Benzo[a]pyrene; Beryllium; Bromochloromethane; Bromomethane; Cadmium; Carbofuran; Carbon tetrachloride; Chlorate; Chlordane; Chlorodifluoromethane; Chloromethane; cis-1,2-Dichloroethylene; Cobalt; Cyanide; Dalapon; Di(2-ethylhexyl) adipate; Di(2-ethylhexyl) phthalate; Dichloromethane (methylene chloride); Dinoseb; Diquat; Endothall; Endrin; Ethylbenzene; Ethylene dibromide; Glyphosate; Haloacetic acids (HAA5); Heptachlor; Heptachlor epoxide; Hexachlorobenzene (HCB); Hexachlorocyclopentadiene; Lindane; Mercury (inorganic); Methoxychlor; Monochlorobenzene (chlorobenzene); Nitrite; o-Dichlorobenzene; Oxamyl (Vydate); p-Dichlorobenzene; Pentachlorophenol; Perfluorobutane sulfonate (PFBS); Perfluoroheptanoic acid (PFHPA); Perfluorohexane sulfonate (PFHXS); Perfluorononanoic acid (PFNA); Perfluorooctane sulfonate (PFOS); Perfluorooctanoic acid (PFOA); Picloram; Polychlorinated biphenyls (PCBs); Radium; combined (-226 & -228); Selenium; Simazine; Styrene; Tetrachloroethylene (perchloroethylene); Thallium; Toluene; Toxaphene; trans-1,2-Dichloroethylene; Trichloroethylene; Vinyl chloride; Xylenes (total)

redmond-water-department-water-company-oregon Office

Find out which contaminants are found above Legal and Health Guidelines.

GET THE FACTS & PROTECT YOUR FAMILY!

US Public Records

Redmond Water Department

About Us


97756 Annual Water Report

Email

pdrecords@ci.redmond.or.us


Redmond Water Department Payment Options

For more Oregon resources & information

Oregon Water Utility Companies

.. ...

Oregon EPA Water Reports

For more information on your drinking water, visit the U.S. Environmental Protection Agency:

Redmond Water Department Drinking Water Company and EPA

Redmond Water Department Drinking Water Report Info
As often as possible Asked Questions When is a license required? The's city code section 3.600 to 3.613 states that "a person will obtain a grant approved by the City Arborist or designee prior to planting, removing or major pruning any tree located on an open zone." City staff on official business and open service companies that hold a present establishment concurrence with the City are excluded from the license prerequisite. What is an open zone? An open region is property owned by the City, all committed open privileges of-way and any property under the influence of the City. For instance, city parks, middle strips and property paralleling a committed open road, including walkways, are altogether open regions. On most committed open boulevards, the open privileges of-way can be dictated by estimating 30' out from the focal point of the asphalt on the road. What is major pruning? Major pruning is the particular removal of over 20% of a tree's crown (inside a yearly growing season) to meet explicit goals and objectives. The crown is the leaves and parts of a tree estimated from the lowest branch on the storage compartment to the top of the tree. Topping isn't major pruning and is generally a prohibited movement. The action I have arranged does not require an approved grant. Would i be able to go ahead and start work? Before beginning work, we recommend that you contact the City Arborist (541) 504-2000 to ensure the arranged movement will be conducted as per the provisions of Redmond City Code. City Code prohibits certain exercises and requires measures be taken to protect an open tree from harm. What occurs after a license application is submitted? The application will be assessed by the City Arborist. The candidate and property owner will be notified of application approval or forswearing. In most cases, notification will be inside 5 working days from submittal of application. What are the criteria that should be met to get approval to remove a tree? Licenses to remove open trees will be conceded only if the City Arborist or designee discover that at any rate one of the following conditions exists: A. The tree is hazardous and removal is the only treatment that will turn around the danger. A hazardous tree is a tree or tree part that has a high potential to come up short and cause harm or damage to people or property. B. The tree is dead or biting the dust, and its condition cannot be switched. C. The tree is unhealthy and presents a potential risk to other trees inside the City. D. The tree is making harm close by open or private foundation and the harm cannot be corrected through reasonable treatment or support to the tree or the framework. E. The tree, which has been resolved to be of reasonable or poor condition, is antagonistically influencing the strength of neighboring open trees that have been resolved to be of good or incredible condition. F. The tree is located under an electrical power line and an ISA Certified Arborist/Utility Specialist has decided the tree will expect topping to meet Oregon Public Utility Commission principles. An approved license to remove a tree may incorporate a provision requiring the permittee to supplant the trees removed with trees approved by the City Arborist. What are the criteria that should be met to get approval to plant a tree? Licenses to plant a tree on an open territory will be allowed if the City Arborist or designee confirm that: A. The qualities of the site will allow a tree to grow to a sound develop size and do so without becoming an annoyance. B. The tree species is tolerant of the site's attributes. C. The tree species isn't on the City Arborist's prohibited rundown. What are the criteria that should be met to get approval to major prune a tree? Licenses to major prune open trees will be conceded if the City Arborist or designee discovers that at any rate one of the following objectives must be met by pruning more than 20% of the tree's crown: A. Decrease danger of tree disappointment (branch or whole tree). B. Keep up the soundness of the tree. C. Alleviate tree impedance with road or walkway traffic. Are there work performance norms that should be followed? Indeed. A copy of these gauges is accessible for audit at City Hall, the Deschutes County Library – Redmond branch, and the City Public Works Building. Would i be able to request the decision of the City Arborist? Indeed. A composed letter routed to the Parks Division, 243 E Antler Ave, Ste. #100, Redmond, OR 97756 must be recorded inside 12 working days after the City Arborist's decision. On the off chance that you have further questions in regards to the Public Tree Permit Application, it would be ideal if you contact Cassie Sigloh, City Arborist at 541.504.2000 or email at cassie.sigloh@ci.redmond.or.us.

Drinking Water Utility Company FAQ

Oregon CDC Tap Water Info

For more information on your drinking water, visit the U.S. CDC:

Redmond Water Department Drinking Water Company and CDC

.. ...

Redmond Water Department consumer info

Redmond Water Department provides drinking water services to the public of Redmond and Redmond, Oregon.

Limited Time - Get the Redmond Water Department Water Score Report for Free.


Added to cart!